High Speed Rail Selma

Selma to Earlimart, California

VPI High Speed Rail Selma

This project relocates overhead electrical lines underground in preparation for California High-Speed Rail Authority’s construction package 2-3, a 60-mile stretch within the counties of Fresno, Tulare and Kings. VPI installed conduit and vaults at various locations where the High-Speed Rail right away intersects existing infrastructure. Work included collaboration with multiple state and federal agencies, as well as other contractors performing work on the HSR project.

Business Line: Electric
Performed By: Veteran Power Infrastructure (VPI), a Charge company
Delivery Method: Construction services/Project management
Size: 6+ miles

Project Highlights

  • 35 locations crossing new HSR right away
  • 31,813 LF of trenching
  • 98 #7 vaults
  • 15 Auger bores

Project Services

  • Utility Locating
  • Directional Drilling
  • Auger boring
  • Traffic Control
  • Vault Installation
  • Engineering
  • GPS as built data collection