The Lincoln High School project scope was to dig and set three 8-Series vaults, tying into two existing energized vaults, and a trench package of (12) 6” conduits to provide the required electrical access for the rebuild of Lincoln High – the only Portland public school in the downtown core. The project will be completed in two phases; the first completed in the fall 2021, and the second to be complete in summer 2022.

Business Line: Electric
Performed By: Extreme Excavating Company
Delivery Method: Construction services

Project Highlights

  • Three 8-series vaults
  • 1,600 LF of  duct bank (trench)
  • 12 6″ conduits

Project Services

  • Trenching
  • Hydro excavation
  • Vault installation
  • As-build documentation