Butte County Rebuild

Paradise, California

With efforts underway to rebuild the city of Paradise, VPC was one of three contractors selected for an EPC model portfolio (Engineer, Procure, Construct) that will provide gas and electric infrastructure to residential spaces. Through these efforts more residents will be able to move back into the community while also being provided with new, safe and reliable energy sources. As part of this work, VPC will connect service to 419 new mobile home spaces in seven parks. Additionally, Charge companies are rebuilding gas and power infrastructure as part of the Community Rebuild and Resiliency Program.

Business Line: Electric & Gas
Performed By: Veteran Pipeline Construction (VPC), a Charge company
Delivery Method: Engineer, Procure & Construct
Size: 28.4 miles

Project Highlights

  • Paradise Mobile Home Park Reconstruction: Installation of more than 18,667 linear feet (LF) of gas main and 419 services
  • Butte County Rebuild: Install gas and electric service with 475 completed services as of June 2022.

Project Services

  • Engineering
  • Procurement
  • Community Outreach Coordination
  • Directional Drilling
  • Joint Trench Installation
  • As-built Documentation