Lincoln High School
Portland, Oregon
The Lincoln High School project scope was to dig and set three 8-Series vaults, tying into two existing energized vaults, and a trench package of (12) 6” conduits to provide the required electrical access for the rebuild of Lincoln High – the only Portland public school in the downtown core. The project will be completed in two phases; the first completed in the fall 2021, and the second to be complete in summer 2022.
Business Line: | Electric |
---|---|
Performed By: | Extreme Excavating Company |
Delivery Method: | Construction services |
Project Highlights
- Three 8-series vaults
- 1,600 LF of duct bank (trench)
- 12 6″ conduits
Project Services
- Trenching
- Hydro excavation
- Vault installation
- As-build documentation