High Speed Rail Selma
Selma to Earlimart, California
This project relocates overhead electrical lines underground in preparation for California High-Speed Rail Authority’s construction package 2-3, a 60-mile stretch within the counties of Fresno, Tulare and Kings. VPI installed conduit and vaults at various locations where the High-Speed Rail right away intersects existing infrastructure. Work included collaboration with multiple state and federal agencies, as well as other contractors performing work on the HSR project.
Business Line: | Electric |
---|---|
Performed By: | Veteran Power Infrastructure (VPI), a Charge company |
Delivery Method: | Construction services/Project management |
Size: | 6+ miles |
Project Highlights
-
35 locations crossing new HSR right away
-
31,813 LF of trenching
-
98 #7 vaults
-
15 Auger bores
Project Services
- Utility Locating
- Directional Drilling
- Auger boring
- Traffic Control
- Vault Installation
- Engineering
- GPS as built data collection