Santa Rosa Road Parallel Bores
Lompoc, California
To support new construction for a winery production facility, ABD successfully installed two 8″ HDPE sleeves using directional drilling to underground six utilities including electrical, telecommunication, water reclamation and sanitary sewer. Using two 40,000-pound directional rigs, the parallel bores crossed below Salsipuedes Creek, reaching depths of 90 feet. Crews worked in tandem to complete the job 10 days early to meet time sensitive requirements. ABD procured supplies and equipment, and assisted with planning and permitting, including preparation of the topographic survey and design bore profile.
Performed By: | Accu-Bore Directional (ABD), a Charge company |
---|
Project Highlights
- Location #1: Directional bore approximately 700 LF and pull back one 8” HDPE DR11 Sleeve with three 2” DR11 pipe inside, 25 feet below flow line.
- Location #2: Directional bore approximately 700 LF and pull back second 8” HDPE DR11 Sleeve with three 2” DR11 pipe inside, 25 feet below flow line.
- Handle and dispose of all non-hazardous vacuum able drill mud at customer supplied location on winery.
- Supply, handle and fuse all 8” and 2” HDPE
- Frac-Out equipment
Project Services
- Topographic survey
- Design Bore Profile
- Supply Procurement
- Directional Drilling
- Expedited Timeline