Monument Fire Rebuild
Willow Creek, California
This project is one of many Charge companies have completed to rebuild wildfire-impacted areas by restoring power and reducing future wildlife risks.
View ProjectShingle Springs Fire Hardening
Shingle Springs, California
To relocate utilities from overhead lines to underground pipes, ABD installed 1.7 miles of conduit via directional drilling.
View ProjectPope Valley Road System Hardening
Napa County, Calif.
VPI completed a 3.6-mile project along Pope Valley Road in Napa County as part of a larger award to underground 39 circuit miles of power lines.
View ProjectBonanza Rule 20A
Walnut Creek, California
A VPC/VPI combined “cradle to grave” joint trench EPC project to relocate overhead utility lines.
View ProjectMarquam Radial Feeder System
Portland, Oregon
The Marquam Radial scope expanded the Marquam substation to deliver service to Portland's South Waterfront, as well as accommodate future radial feeder getaways.
View ProjectLincoln High School
Portland, Oregon
The Lincoln High School project scope was to dig and set three 8-Series vaults, tying into two existing energized vaults and a trench package of (12) 6” conduits.
View ProjectPearl Apartments
Portland, Oregon
Installation of vaults, primary and secondary conduits conduit for a new construction apartment building in Portland’s Pearl District.
View ProjectAvila Beach
San Luis Obispo, California
ABD crews were treated with spectacular views while replacing a section of exposed/leaking natural gas service over a coastal bluff using a Ditch Witch 4020 directional boring rig. The project involved installing new pipeline parallel to the path of the existing pipeline, connecting the new service to the distribution system and abandoning the old pipeline.
View ProjectCopper Service Replacement Program
Multiple locations throughout California
VPC designed and constructed service replacements, supporting a 3-year gas distribution program to remove remaining underground copper services installed in the 1930s and 1970s.
View ProjectBerkeley Cable Replacement
Berkeley, California
This power cable replacement project in downtown Berkeley replaced vulnerable cable, some of which dated back to the 1930’s.
View ProjectColusa Rule 20A Utility Relocation
Colusa, California
Installation of more than 15,500 linear feet (LF) of joint trench to convert overhead to underground distribution along a major arterial roadway as part of a larger Caltrans project to flatten the roadway, construct new sidewalks, and improve drainage.
View ProjectCamp Pendleton
Marine Corps Base Camp Pendleton, California
Returning back to where it all began! In 2006 we completed our first bore job at MCB Camp Pendleton and then returned in 2009 to complete four other major infrastructure projects. This project kicked off in the fall of 2018, with VPC leading the construction effort to install more than five miles of HDPE gas pipeline.
View ProjectAldyl-A Replacement Program
Multiple locations throughout California
VPC is actively replacing gas mains and service lines around California as part an ongoing effort to upgrade plastic and steel pipelines with modern materials.
View ProjectHigh Speed Rail Selma
Selma to Earlimart, California
This project relocates overhead electrical lines underground in preparation for California High-Speed Rail Authority's construction package 2-3 — a 60-mile stretch within the counties of Fresno, Tulare and Kings.
View ProjectSanta Rosa Road Parallel Bores
Lompoc, California
To support new construction for a winery production facility, ABD successfully installed two 8″ HDPE sleeves to underground six utilities including electrical, telecommunication, water reclamation and sanitary sewer.
View ProjectButte County Rebuild
Paradise, California
With efforts underway to rebuild the city of Paradise, VPC is working to provide gas and electric infrastructure to help residents move back into the community while also being provided with new, safe and reliable energy sources.
View ProjectHigh Speed Rail Fresno
Fresno, California
VPI provided engineering and construction services to underground PG&E overhead electric lines as part of California High-Speed Rail Authority’s work to build a 119-mile stretch through the Central Valley.
View ProjectSouth Bay Mobile Home Park
San Jose, California
This 216-space MHP in Santa Clara County received a major upgrade to their gas and electric infrastructure.
View ProjectR.O. Loop 556
Downtown San Francisco, California
VPI crews converted a network of streetlights across five city blocks in a highly trafficked area to efficient LED, along Howard Street, from 4th and 9th Streets.
View ProjectRocky Canyon Road
Atascadero, California
In a rugged and rocky area south of downtown Atascardero, a leak was detected in a high pressure gas transmission line located on privately owned land.
View ProjectSanta Monica Debris Basin
Santa Barbara County, California
Following the massive Thomas fire, more than 50 feet of debris and sediment were trapped by heavy rains in the basin and needed to be removed before another impending storm.
View Project